Pictorial : Building the project.

 
 

3D pictures supplied by René VE2MPA

Bottom and Top view

Installation of the sockets and the small components.

Marcel VE2GMR

LEDs installation on the PC Board.

Soldering the LEDs.

The LEDs installation are made as a production line.

The female holders on the PC Board to receive the LCD.

Soldering of the holders to the LCD.

The LCD display in installed on the PC Board.

LCD soldering is completed.

Both PCBs are installed in the box.

The first electrical test with 12 volts.

Soldering the wiring on the DB-9 and DB-15 connectors.

René VE2MPA soldering the control wire to the DB-15.

The Dopplers are almost completed.

Connecting the 12 volts and the audio wire.

Doppler is ready for its box.

The cover installation.

The spectrum analyzer will soon check all our errors!

All antennas are ready to take out.

The Doppler is completed.