Pictorial : Antenna switching section

 
 

Luc VA2LUK prepares the material for the switcher box.

Serge VE2HLS and Maurice VE2MIE no more current ?

Serge VE2HLS soldering.

Separations to insolate the four antennas.

 

The box is completed.

We must make 16 of them.

The switcher PCB is completed.

The 0.47uH inductors are very small !

The PC Board is now in the box.

The separations are ready for soldering.

The PC Boards are soldered to the boxes.

We must solder the RG-174 coaxes to the PC Board.

Luc VA2LUK

Soldering of the parts is completed.

Manufacture is done as a production line.

The switcher is installed in the plastic box.

The separations are getting soldering.

Final soldering of the cover.